Location Selection
Alongside Existing Infrastructure
When deploying the SR-series alongside existing network equipment, in a telco closet for instance, please consider the following (when possible):
• Avoid metal enclosures.
• Maximize distance from other equipment.
• Mount the device on the most exterior wall.
• Higher elevations are ideal.
New Deployments
If there aren't any networking appliances currently installed at the deployment location, consider mounting the cellular router close to a window for optimal reception (in addition to the aforementioned list).
The 6350-SR does not support Power over Ethernet (PoE). It MUST be located near an electrical outlet.